MENU

Wayne Fleming Arena Renovations

The Winnipeg ICE will play the 2019-2020 and the 2020-2021 Western Hockey League regular season out of Wayne Fleming Arena at the University of Manitoba campus.

Starting in the 2019-2020 season, ICE fans will observe a number of significant improvements made to Wayne Fleming Arena including a video scoreboard, expanded seating, Premium Loge Seating, Premium Party Lounges and concession upgrades.

Below are the details about the exciting improvements being made to Wayne Fleming Arena:

 

EXPANDED SEATING

Once the 2019-2020 Western Hockey League regular season begins, seating capacity at Wayne Fleming Arena will be increased from 1,400 to 1,600.

To accommodate for the added seating, a new balcony will be added on the east side of the arena. This is where the Premium Loge Seating will be located which will provide patrons with an excellent elevated view of the ice surface. In addition, a Fort Garry Brewing Co. Party Lounge will be created providing a close-up view of the action at ice level.

 

IN-SEAT SERVICE

The Winnipeg ICE in-game experience will be enhanced with in-seat service in partnership with the University of Manitoba Dining Services and Aramark.

Regular and Premium Seating will be provided in-seat service of confectionary menu items like fresh popcorn, chocolate bars, salted peanuts, cotton candy, chips and beverages.

The Fort Garry Brewing Co. Party Lounge and Premium Loge Seating will be offered the same in-seat service of confectionary items and beverages, along with an expanded menu featuring Premium ICE Meals (menu still to be announced), as well as other Fan Fare Favourites including Loaded Nachos, Beef Burger on a French Bun, Chicago Style Hot Dog, Poutine Trio or French Fries New York Style.

 

CONCESSION UPGRADES

The concession areas within Wayne Fleming Arena will be upgraded. Digital menu boards will be installed prior to the 2019-2020 Western Hockey League regular season. Aramark will be introducing Rotating Features (one main feature per game) such as taco-in-a-bag, pizza by the slice, boneless chicken bites and other delicious grab-and-go items, along with a signature ICE float and a variety of ice cream sandwiches. Mobile units will be available on the concourse offering pizza, mini doughnuts, pretzels and cotton candy. Fan Fare Favourites and Premium ICE Meals will be available to all patrons at the main concession on the north side of the arena.    

In addition, the ICE will be offering a VIP Lounge pre and post game experience during weekend games. The experience will include a pre-sold buffet with menu themes that change from game to game. The pre-game VIP Lounge will feature menus like a Pasta or Taco Bar, a Chili, East Indian, Mediterranean or Ukrainian buffet, Pub-Style Fare Menu or Beef-on-a-Bun. The post game experience will allow fans the opportunity to enjoy beverages on site. The VIP Lounge provides patrons with the chance to enjoy a great meal, a venue to host clients or a convenient location to extend their night out pre or post game.

 

VIDEO SCOREBOARD

One of the most noticeable additions to Wayne Fleming Arena will be the video scoreboard located over center ice. The scoreboard will provide fans with an enhanced game experience including replays, in-game entertainment and more. It will be installed and operational prior to the start of the 2019-2020 Western Hockey League regular season.

 

MEDIA AREA UPGRADES

The existing media area on the east side of Wayne Fleming Arena is being expanded and enhanced. A new balcony with seating along center ice is being created along with additional camera positions. The balcony will provide a countertop work surface as well as power and data for the use of laptops and other equipment.

Other improvements to the media area include new paint and flooring finishes, new furniture, lighting, power, data and wifi. The room will also include an area for video replay.

 

OTHER ARENA UPGRADES

Additional arena upgrades include the following:

  • New arena glass will be installed.
  • New safety netting will be installed at each end of the arena.
  • New flooring suitable for skate blades will be installed from the dressing rooms to the ice surface.
  • Protection will be installed at the entrance tunnels for the safety of the visiting players and officials.
  • The visitors dressing room will be upgraded with new flooring, overhead millwork for storage of equipment, as well as timing clocks.

 

Below are renderings of Wayne Fleming Arena ahead of the inaugural Winnipeg ICE season:

 

6

 

 

5

 

 

Screen Shot 2019-04-26 at 5.05.34 PM

 

 

2

 

 

1